Digital Library

cab1

 
Title:      DELAY ANALYSIS OF IEEE 802.11 MAC ACCESS PROTOCOL BASED ON M/G/1
Author(s):      Gonzalo Arroyo, Walter Grote
ISBN:      978-972-8939-19-9
Editors:      Hans Weghorn, Jörg Roth and Pedro Isaías
Year:      2010
Edition:      Single
Keywords:      MAC IEEE 802.11 delay, M/G/1 queue, service time distribution, no-saturated channel
Type:      Full Paper
First Page:      98
Last Page:      108
Language:      English
Cover:      cover          
Full Contents:      click to dowload Download
Paper Abstract:      This paper presents an analytical model to calculate the total MAC delay experimented for packets, for stable network conditions. This model considers that each station of the network has an M/G/1 transmission queue. What differences this paper from others is that the total delay is derived directly from the exact service time distribution of a packet of the backoff algorithm, instead of using approximations. The no-saturated channel model relies on the idle time of the station, which is also a new approach that avoids approximations from previous models. Evaluations of this model show that it is in close agreement with simulation results.
   

Social Media Links

Search

Login